Various parameters to start the system of Calibration load cell:
- Inspection to be done for the cable and coil of load cells to protect any excess: There should be the equal distribution of load amongst the various load cells installations. If it differs, then the load should be rebalanced back again.
- Primarily the Dummy Load cells should be used before completion: The mechanism requires the shelves to adjust the weights. But in the ASME categories of vessels, these get attached after when the vessels gets fabricated.
- Shifts in the balance: Which is zero takes place because of the residual stress in the areas which are sensitive. These residual stresses come up due to the overloading of the cell or because of the repeated operation cycles.